Statement of Clarification Concerning the Annexation of the Crown Property and a Possible Referendum

It appears that misconceptions have arisen regarding the recent annexation of the Crown property. Because this information has been posted directly to the Village’s Facebook page by one or more members of the public, the Village believes it is necessary to provide clarification.

 

Specifically, members of the community have apparently been advised or are under the perception that by circulating a petition and obtaining a certain number of signatures, the Crown annexation will be placed on a ballot for referendum. However, the annexation of the Crown property was a voluntary annexation, which means that 100% of the property’s ownership sought annexation and the Owner and the Village mutually agreed upon the annexation. There are no electors residing on the annexed property. The section of the Municipal Code governing a voluntary annexation does not provide for a referendum; that is a process reserved for other types of annexations contained in the Municipal Code and which are not applicable here.

 

Without anything actually having been filed, it is difficult to provide any further assessment. However, to reiterate, the Village does not believe that the Municipal Code provides any legal basis for a referendum in the case of a voluntary annexation.

fire hydrant
By Tracey Conti • October 5, 2026
2026 Hydrant Flushing Schedule
By Tracey Conti • September 29, 2026
Maintenance Worker 1 - Streets
By Tracey Conti • September 18, 2026
Sugar Grove Police Department
By Tracey Conti • September 1, 2026
TRAFFIC ALERT
By Tracey Conti • August 27, 2026
Reconvened Meeting Scheduled for September 2, 2026, is Canceled
By Scott koeppel • August 20, 2026
By Tracey Conti • August 19, 2026
The Illinois Department of Transportation announced today that repairs to the bridge carrying U.S. 30 (Illinois 56) over Illinois 47 (U.S. 30), in Sugar Grove, is scheduled to begin, weather permitting, Monday, Aug. 17. ​ Throughout the project, the following closures will be required to complete the work. U.S. 30 The right lane on eastbound U.S. 30 will be closed over the bridge. The eastbound U.S. 30 ramp to northbound Illinois 47 will be closed. A detour will direct traffic to Illinois 56 and Galena Boulevard to access Illinois 47. Illinois 47 The left lane on southbound Illinois 47 will be closed. The public can also expect various intermittent daytime lane closures on northbound Illinois 47, at least one northbound lane will remain open during construction. Additionally, later this month, a full closure of the northbound lanes on Illinois 47 will be required to install steel beams over the road. The schedule and impacts to traffic will be shared closer to the closure date. ​ ​ The repairs are expected to be completed in September. The public can expect delays and should allow extra time for trips through this area. Alternate routes are encouraged. Drivers are urged to pay close attention to flaggers and signs in the work zones, obey the posted speed limits and be on the alert for workers and equipment.  For more information on IDOT projects, click here . Find traffic and road conditions at www.gettingaroundillinois.com . You also can follow IDOT on Facebook and X .
By Tracey Conti • August 7, 2026
Don't make it easy for thieves.
By Tracey Conti • July 14, 2026
To ensure enough water for drinking, bathing, and fire protection this summer, all residents must comply with the village's water conservation ordinance. Watering to establish sod or seeded turf lawns is prohibited from July 1 to August 31. Water Conservation Guidelines: Even-numbered addresses may water on even dates from 6:00 a.m. to 9:00 a.m. and 6:00 p.m. to 9:00 p.m. Odd-numbered addresses may water on odd dates during the same hours. For more details, visit: https://irp.cdn-Website.com/.../Water-Conservation.pd
Employment Opportunity
By Tracey Conti • July 14, 2026
MAINTENANCE WORKER I
More Posts